The Concrete Centre

Demolition and alterations of post-tensioned slabs

 

SPEAKER : Kevin Bennett, PTA

DATE : 29th September 2009

 

  • Features of post-tensioned slabs
  • Preconstruction and planning for preparations
  • Getting it right
  • Post construction: Cutting holes
  • Getting it wrong
  • Penetration plan
  • Locating tendons
  • New escalator penetration
  • Features of unbonded PT
  • Case study : Westfield
  • Case study : Marlowe Way, Croydon
  • Case study : Car park, Australia
  • Summary
Get Adobe Flash player